“The plods come in from site on Monday, the geo signs them Wednesday, and accounts invoice whenever they get to it. The double-billed metres and the standby nobody can back up, we find out about when the client does.”

— WA drilling contractor, RC and diamond rigs across the Goldfields

Back to Demos

Agent #18 · New

Plod Reconciliation Agent

In pilotEight checks every morning · Measured in pilot

Every plod is the start of an invoice, a pay run and a service record. Today someone checks it by hand against timesheets, the diary and the invoice register, if they get to it. This agent checks every plod every morning against all of them, plus engine hours, stock and the service schedule, and sends your managers a short list of what to fix before the client sees it.

Apply for the free 3-month pilot5 spots. Applications close 5 Feb 2027.

Plod Reconciliation · sample data

Last 7 days · 3 rigs · 42 shifts checked

10
Open
3
High
0
Resolved
  • highApproved but not invoiced· Rig 11$14,280 unbilled

    Approved plod P-24817 isn’t on any invoice ($14,280)

    Rig 11, 6 Nov, Menzies North RC. Approved 14+ days ago and no imported invoice line references it.

  • highDepths and metres· Rig 116 m double-billed

    MNRC0142: 84–90 m appears on two plods

    Plod P-24822 (17 Nov) ended at 90 m, but plod P-24825 (18 Nov) starts at 84 m. Those metres would be billed twice.

  • highStandby coding· Rig 07$1,925 at risk

    Rig 07: 3.5 h client standby with no diary record

    The plod codes “waiting on geo”, but no Site Diary entry for Rig 07 that day records a client-directed delay. Without it, the client geologist will strike the standby.

  • mediumRig hours vs engine hours· Rig 14

    Rig 14: engine ran 13.6 h, plods account for 11.0 h

    2.6 h of engine time isn’t on any plod for 18 Nov. Either chargeable work wasn’t plodded, or the rig ran on a breakdown or move nobody recorded.

  • mediumCrew hours vs timesheets· Rig 14

    J. Nguyen: plod 12.0 h, timesheet 14.0 h

    The timesheet claims 2.0 h more than the plod for 19 Nov. Check it before payroll runs.

  • mediumStandby coding· Rig 11

    Rig 11: 2.0 h standby coded “compressor fault”

    That reason reads as a contractor-caused delay. Most drilling contracts don’t let you bill it as standby. Recode it as downtime unless the contract says otherwise.

  • mediumRig servicing· Rig 07

    Rig 07: 46 h plodded since its service was due (14 Nov)

    4 shifts on the plods after the due date. Book the service in Fleet before it turns into a breakdown on site.

  • mediumShift length and fatigue· Rig 07

    D. Walsh: 13.5 h shift on 19 Nov

    Over the 12 h shift limit set for fatigue checks. Confirm the hours, and record the rest break or journey plan in Fatigue Management.

  • lowBits and consumables

    Reorder RC hammer bits 5.5 in: 2 left after plodded use

    6 on hand, 4 used on plods not yet drawn down, reorder level 4.

  • lowBits and consumables· Rig 14

    Rig 14: draw down 3 items from stock

    Used on plod P-24829: 2 × HQ core bit, 40 × core trays, 1 × bentonite 25 kg. Accept to take them off the stock count.

Sample rigs, projects and crew. Click an exception's action to see how it resolves.

Checking plods by hand

  • •Plods arrive days late, and checking them waits for whoever has time
  • •Crew hours on the plod and on the timesheet never get compared
  • •Standby coded with no reason, or with a contractor fault the client won’t pay
  • •The same metres turn up on two plods, or a gap nobody bills
  • •Approved plods sit uninvoiced for weeks
  • •Bits and consumables used on site never come off the stock count
  • •Rigs keep drilling past their service due date

With the Plod Reconciliation Agent

  • •Every plod checked every morning, before anyone asks
  • •Crew hours matched to timesheets, worker by worker
  • •Standby checked for a reason, and client standby checked against the Site Diary
  • •Depth overlaps and gaps flagged hole by hole, before invoicing
  • •Approved plods with no invoice line listed, with the dollar value
  • •Consumables drawn down from stock in one click, with reorder alerts
  • •Engine hours from telematics compared with plodded hours, rig by rig

Import the plods

Upload the CSV export from your plod app or spreadsheet. Columns are mapped once; re-importing the same plods never duplicates them.

Eight checks run

Against timesheets, engine hours, the Site Diary, invoices, stock and the service schedule. Each finding names the rig, the plod and the fix.

Morning brief

A short email at 6 am to owners and managers: what to fix first, then everything else this week.

Client summary

Metres, drilling, standby and downtime by rig for the week, ready to check and send.

The Eight Checks

Crew hours vs timesheets

Hours on the plod against each worker’s timesheet, and plodded names that don’t match a worker.

Rig hours vs engine hours

Plodded time against telematics engine hours from Fleet. Gaps are unbilled work or unrecorded breakdowns.

Standby coding

Standby with no reason, contractor faults coded as standby, and client standby with no Site Diary record.

Approved but not invoiced

Approved plods with no matching invoice line after the grace period, with the value.

Depths and metres

Overlapping depths billed twice, gaps nobody billed, and metres that don’t match from and to.

Bits and consumables

Plodded usage drawn down from Spare Parts Inventory, with reorder alerts and unknown items flagged.

Rig servicing

Rigs still plodding hours after their service due date in Fleet.

Shift length and fatigue

Long shifts, day-and-night doubles and long runs of consecutive days, for review in Fatigue Management.

Annual Value

Measured in pilot

This agent is new. Rather than model a figure, we measure it on real rigs during the pilot and publish it once it's proven.

What we measure

Unbilled plods found

Approved plods with no invoice, and their value

Standby recovered

Client standby backed by a diary record instead of struck off

Metres corrected

Overlaps and gaps fixed before the client queried them

Days to invoice

From plod approval to invoice, before and after

Works best alongside Site Diary, Timesheets, Fleet and Spare Parts Inventory, which supply the timesheets, diary entries, engine hours and stock the checks compare against.

Frequently Asked Questions

Common questions about DrilLedger's Plod Reconciliation Agent

What is a drill plod, and why does it need reconciling?

A plod is the daily drilling report a driller fills in for each rig and shift: holes and depths drilled, metres, drilling hours, standby and downtime with reasons, crew, and the bits and consumables used. It is the source document for the client invoice, for payroll and for the rig's service hours, so an error on the plod turns into an invoice dispute, a payroll correction or a missed service. Most contractors check plods by hand against several other records, which is why errors are usually found by the client first.

Does it replace our plod software or paper plods?

No. Your drillers keep filling in plods the way they do now, on paper, a spreadsheet or a plod app. The agent imports the CSV export, and the columns are mapped once when you set it up. If a column name isn't recognised, an AI step suggests the mapping from the header names only, and you confirm it. The plod data itself is never sent to the AI model.

What does it check?

Eight things, every morning: crew hours on the plod against timesheets; plodded rig hours against engine hours from the rig's telematics; standby coding, including client standby that has no Site Diary record; approved plods that are not on any invoice; depth overlaps, gaps and metres that don't add up; bits and consumables against stock, with reorder alerts; rigs plodding past their service due date; and shift lengths, double shifts and long runs of consecutive days for fatigue review.

How does it work with the Site Diary and Variations agents?

When a plod codes client or weather standby, the agent looks for a Site Diary entry for that rig and day that records the delay. If there isn't one, it raises an exception before the plod goes to the client. From that exception you can draft a variation, so the standby claim, the diary entry and the plod stay linked.

Does anything go to the client automatically?

No. The agent raises exceptions and a manager accepts, fixes or queries each one. The weekly client summary is a CSV of metres, hours and standby by rig that you review and send yourself. AI does the paperwork, a person signs off.

Why is there no dollar figure for this agent yet?

Because it is new, and we would rather measure it than model it. During the pilot we track unbilled plods found, standby recovered, metres corrected and the days from plod approval to invoice, and we will publish the figure once it is measured on real rigs.

Want to see how your whole operation compares?

Take the 2-minute Mining Admin Scorecard

Ready to Stop Checking Plods by Hand?

Import a week of plods. See what the client would have found first.

Apply for the free 3-month pilot

5 spots. Applications close 5 Feb 2027. Not ready? Take the 2-min Scorecard · call 08 6244 7100 (9–5 WST)