“The plods come in from site on Monday, the geo signs them Wednesday, and accounts invoice whenever they get to it. The double-billed metres and the standby nobody can back up, we find out about when the client does.”
— WA drilling contractor, RC and diamond rigs across the Goldfields
Agent #18 · New
Every plod is the start of an invoice, a pay run and a service record. Today someone checks it by hand against timesheets, the diary and the invoice register, if they get to it. This agent checks every plod every morning against all of them, plus engine hours, stock and the service schedule, and sends your managers a short list of what to fix before the client sees it.
Plod Reconciliation · sample data
Approved plod P-24817 isn’t on any invoice ($14,280)
Rig 11, 6 Nov, Menzies North RC. Approved 14+ days ago and no imported invoice line references it.
MNRC0142: 84–90 m appears on two plods
Plod P-24822 (17 Nov) ended at 90 m, but plod P-24825 (18 Nov) starts at 84 m. Those metres would be billed twice.
Rig 07: 3.5 h client standby with no diary record
The plod codes “waiting on geo”, but no Site Diary entry for Rig 07 that day records a client-directed delay. Without it, the client geologist will strike the standby.
Rig 14: engine ran 13.6 h, plods account for 11.0 h
2.6 h of engine time isn’t on any plod for 18 Nov. Either chargeable work wasn’t plodded, or the rig ran on a breakdown or move nobody recorded.
J. Nguyen: plod 12.0 h, timesheet 14.0 h
The timesheet claims 2.0 h more than the plod for 19 Nov. Check it before payroll runs.
Rig 11: 2.0 h standby coded “compressor fault”
That reason reads as a contractor-caused delay. Most drilling contracts don’t let you bill it as standby. Recode it as downtime unless the contract says otherwise.
Rig 07: 46 h plodded since its service was due (14 Nov)
4 shifts on the plods after the due date. Book the service in Fleet before it turns into a breakdown on site.
D. Walsh: 13.5 h shift on 19 Nov
Over the 12 h shift limit set for fatigue checks. Confirm the hours, and record the rest break or journey plan in Fatigue Management.
Reorder RC hammer bits 5.5 in: 2 left after plodded use
6 on hand, 4 used on plods not yet drawn down, reorder level 4.
Rig 14: draw down 3 items from stock
Used on plod P-24829: 2 × HQ core bit, 40 × core trays, 1 × bentonite 25 kg. Accept to take them off the stock count.
Sample rigs, projects and crew. Click an exception's action to see how it resolves.
Upload the CSV export from your plod app or spreadsheet. Columns are mapped once; re-importing the same plods never duplicates them.
Against timesheets, engine hours, the Site Diary, invoices, stock and the service schedule. Each finding names the rig, the plod and the fix.
A short email at 6 am to owners and managers: what to fix first, then everything else this week.
Metres, drilling, standby and downtime by rig for the week, ready to check and send.
Hours on the plod against each worker’s timesheet, and plodded names that don’t match a worker.
Plodded time against telematics engine hours from Fleet. Gaps are unbilled work or unrecorded breakdowns.
Standby with no reason, contractor faults coded as standby, and client standby with no Site Diary record.
Approved plods with no matching invoice line after the grace period, with the value.
Overlapping depths billed twice, gaps nobody billed, and metres that don’t match from and to.
Plodded usage drawn down from Spare Parts Inventory, with reorder alerts and unknown items flagged.
Rigs still plodding hours after their service due date in Fleet.
Long shifts, day-and-night doubles and long runs of consecutive days, for review in Fatigue Management.
Annual Value
This agent is new. Rather than model a figure, we measure it on real rigs during the pilot and publish it once it's proven.
Unbilled plods found
Approved plods with no invoice, and their value
Standby recovered
Client standby backed by a diary record instead of struck off
Metres corrected
Overlaps and gaps fixed before the client queried them
Days to invoice
From plod approval to invoice, before and after
Works best alongside Site Diary, Timesheets, Fleet and Spare Parts Inventory, which supply the timesheets, diary entries, engine hours and stock the checks compare against.
Common questions about DrilLedger's Plod Reconciliation Agent
A plod is the daily drilling report a driller fills in for each rig and shift: holes and depths drilled, metres, drilling hours, standby and downtime with reasons, crew, and the bits and consumables used. It is the source document for the client invoice, for payroll and for the rig's service hours, so an error on the plod turns into an invoice dispute, a payroll correction or a missed service. Most contractors check plods by hand against several other records, which is why errors are usually found by the client first.
No. Your drillers keep filling in plods the way they do now, on paper, a spreadsheet or a plod app. The agent imports the CSV export, and the columns are mapped once when you set it up. If a column name isn't recognised, an AI step suggests the mapping from the header names only, and you confirm it. The plod data itself is never sent to the AI model.
Eight things, every morning: crew hours on the plod against timesheets; plodded rig hours against engine hours from the rig's telematics; standby coding, including client standby that has no Site Diary record; approved plods that are not on any invoice; depth overlaps, gaps and metres that don't add up; bits and consumables against stock, with reorder alerts; rigs plodding past their service due date; and shift lengths, double shifts and long runs of consecutive days for fatigue review.
When a plod codes client or weather standby, the agent looks for a Site Diary entry for that rig and day that records the delay. If there isn't one, it raises an exception before the plod goes to the client. From that exception you can draft a variation, so the standby claim, the diary entry and the plod stay linked.
No. The agent raises exceptions and a manager accepts, fixes or queries each one. The weekly client summary is a CSV of metres, hours and standby by rig that you review and send yourself. AI does the paperwork, a person signs off.
Because it is new, and we would rather measure it than model it. During the pilot we track unbilled plods found, standby recovered, metres corrected and the days from plod approval to invoice, and we will publish the figure once it is measured on real rigs.
Want to see how your whole operation compares?
Take the 2-minute Mining Admin Scorecard
Import a week of plods. See what the client would have found first.
Apply for the free 3-month pilot5 spots. Applications close 5 Feb 2027. Not ready? Take the 2-min Scorecard · call 08 6244 7100 (9–5 WST)