Limited capacity · 6 spotsEnrolment opens 19 May 202620% off first-year subscription

Mining Admin Automation
Cohort 1

Six Perth mining suppliers. Hands-on Guy-led setup over Q3 2026. All 17 agents configured around your actual workflows — not a generic template.

“I've got a driller starting Monday. His DAS expired last week. Now he's missing his first swing and we're short on site. I spend 6+ hours every swing chasing medical expiries, booking flights one-by-one, and updating three different spreadsheets.”

— Perth mining supplier, $22M revenue, 85 workers across 4 sites

30-day free trial first. No credit card required to apply.

What every Cohort 1 supplier gets

Six benefits, one quarter, no upsells once you're in.

Hands-on Guy-led configuration

~3 weeks of dedicated time per supplier — agents configured around your actual workflows, not a generic template. Direct line to the founder, not a CSM playbook.

All 17 agents available

FIFO Mobilisation, Document Control, Timesheets, Fleet, Quotes, Procurement, Tools, Inventory, Incidents, Training, Client KPIs, Site Diary, Variations, Cashflow, Fatigue, Procedures, Talent Engage.

20% off first-year subscription

Cohort 1 incentive — applied for the full first year, not a 30-day teaser. Locked in for the duration of your contract.

Featured Cohort 1 case-study slot

Your wins (with your sign-off) become Cohort 2 enrolment proof. Optional — opt out if confidentiality matters more than the marketing exposure.

Weekly check-ins through onboarding

30-minute call every Friday during your 3-week setup. Same week you flag a problem, you get a fix — not a ticket queue.

Same product, no early-access tax

Cohort customers get the production app at app.drilledger.com.au — same code that everyone else runs. No "beta" disclaimers, no feature-gates.

Agent #1 · The flagship walkthrough

FIFO Mobilisation in 2 Minutes

Same app every Cohort 1 supplier configures with Guy in week 1. Real expired-worker data. End-to-end on screen.

Cohort 1 calendar

Public dates. No surprises.

Enrolment opens

Mon 19 May 2026

Public launch. LinkedIn, email, video walkthroughs go live.

Final week — last spots

Mon 16 Jun → Mon 23 Jun 2026

7-day close window. Honest "spots remaining" updates.

Enrolment closes

Mon 23 Jun 2026

Cohort 1 locked at 6 (or fewer — see honest reset clause below).

Onboarding starts

Tue 1 Jul 2026

Hands-on Guy-led setup. ~3 weeks per supplier across the quarter.

Onboarding ends

Tue 30 Sep 2026

Cohort 1 fully configured and running. Cohort 2 enrolment opens mid-September.

Honest reset clause

If Cohort 1 fills only 3 of 6 spots — we run it with 3. Better to deliver brilliantly to three Perth suppliers than to over-promise to six. Spots remaining are published every Monday during the 5-week enrolment window. The day we hit 6, we close enrolment publicly and stop selling.

Cohort 1 isn't for everyone

Apply only if you fit the profile. We'll say no on the intro call if you don't.

  • Yes: Perth mining service supplier, $10M-$50M revenue, 30-200 staff, owner-operator, sells into BHP / Rio / FMG / Roy Hill / MinRes
  • No: Tier 1 miners (BHP, Rio, FMG, Roy Hill, FQM themselves), $200M+ contractors with internal IT and procurement, businesses outside WA with no Perth office

Cohort 1 FAQs

Why a cohort instead of just signing up?

Configuration is hands-on. Each setup takes me about three weeks of dedicated time — workflows, integrations, sample-data review, training your admin team. Six suppliers per quarter is what I can deliver well. After Cohort 1, the next enrolment window opens mid-September for Cohort 2.

What happens if Cohort 1 doesn't fill all 6 spots?

Honest reset. If we land at 3 or 4, we run with 3 or 4 — better to deliver brilliantly to a smaller group than over-promise to six. We don't fake-close. Spots remaining are published weekly during the enrolment window.

Can I just start a free trial without joining the cohort?

Yes. The 30-day free trial at app.drilledger.com.au/signup is always open and doesn't require cohort enrolment. The cohort gets you hands-on configuration + 20% off — without it, you self-configure or wait for the next cohort.

What size operation is Cohort 1 built for?

Perth mining service suppliers, $10M-$50M revenue, 30-200 staff. Drilling, labour-hire, fabrication, hydraulics, transport, mechanical services, equipment hire. If you sell into BHP, Rio, FMG, Roy Hill, MinRes — you're probably the right size. If you ARE BHP/Rio/etc., this isn't for you (we'll say so).

What does the application look like? Is there a screening call?

Click "Apply for Cohort 1" — you'll land on the standard signup with cohort=cohort-1 tagged on the lead. I personally call every cohort applicant within 24 hours. The call is 20 minutes: which agents matter most, current admin pain, integrations needed. If you're not a fit, I'll tell you on that call.

What if my biggest pain isn't FIFO mobilisation?

FIFO is Agent #1 because that's what most Cohort 1 outbound is built around (Mobilisation Administrator Seek leads). But the cohort gives you all 17 agents — start with whichever one solves your biggest pain and we'll layer in the rest across the quarter.

Six spots. One quarter. Apply by 23 June.

30-day free trial first. Cohort 1 onboarding starts 1 July 2026.